Long term contract for plant modification
Activities include.
- Design of a new raw water tank for the power plant
- Study of the 15 kV/400 kV busbar connection transfer
- Lighting system and driving force to the corridors accessing the cooling tower fan motors
- Installation of new natural gas meter