Messaggi recenti: MARCELLO ALLOCCA

Long term contract for geothermal plants design

The activities include multidisciplinary engineering services for the drafting by qualified specialists of the technical documents to be used as supporting documentation for the authorization procedures for the construction of systems intended for the exploitation of geothermal energy including drilling stations, wellhead systems, lines for transporting geothermal fluids etc)The documentation was developed with the use…
Read more

Re-design of reagents skid system

Substantial design of the modifications and additions to the skid for the preparation, storage and dosing of reagents in the PP, MP and AP sections of the three central EP gas turbine units in Ostiglia, including the selection of the new double diaphragm dosing pumps
Read more

Biogas Eni Mortara power plant detailed design

The activities include the development of process, layout and executive drawings for the introduction of the biogas upgrading system to methane gas and the consequent modifications and additions to the gas pipes, sewer pipes, tunnels for electrical cables with general repositioning of the systems
Read more

Ash feeding and discharge modifications

Ash feeding and discharge modifications detailed design   Executive design of the new fly ash extraction and dosing systems from the 300 m3 decentralized silos of the Fiumesanto EP plant
Read more

Recenti commenti MARCELLO ALLOCCA

Nessun commento da parte MARCELLO ALLOCCA ancora.