Design of the new natural gas connection line between SNAM station and pressure regulation station. The project includes the executive design of the branches above ground and in the tunnel complete with thermal insulation as well as the selection and positioning of the pressure gauges and reducers
Read more
Soda lump breaker detailed design
Design of a customized lump breaker to facilitate extraction of agglomerated soda from surge hopper.
Read more
Long term contract for plant modification
Long term contract for plant modification Activities include. Design of a new raw water tank for the power plantStudy of the 15 kV/400 kV busbar connection transferLighting system and driving force to the corridors accessing the cooling tower fan motorsInstallation of new natural gas meter
Read more
- 1
- 2